Wing Point Way Construction 1 March 2016

Wing Point Way rocking on ... the slope protection basalt walls are continuing to be pieced together.
Wing Point Way rocking on … the slope protection basalt walls are continuing to be pieced together.
Storm drain plastic pipe is being placed on the north side of the roadway.  Catch basins and other utility infrastructure is being installed.
Storm drain plastic pipe is being placed on the north side of the roadway. Catch basins and other utility infrastructure is being installed.
Workers set a storm water vault on Wing Point Way. The new stormwater pipe is visible in the trench.
Workers set a storm water vault on Wing Point Way. The new stormwater pipe is visible in the trench.

Wing Point Way Construction February 2016

Wing Point Way get some sewer line replacements (not yet, but planned), water line (some progress), stormwater catchment basins, and new bike lanes (they switch from one side of the street to the other), and a sidewalk. This image is early February 2, 2016.
Wing Point Way gets some sewer line replacements (not yet, but planned), a replaced water line (some progress), some new stormwater catchment basins, bike lanes (they switch from one side of the street to the other), and a sidewalk. This image February 2, 2016.
Wing Point Way finally getting bike lane(s) and sidewalk ... after many years of discussions, grants, and delays.
Wing Point Way finally getting bike lane(s), a sidewalk and utility improvements  … after many years of discussions, grants, and delays, excuses, and change of priorities. After all, it is Bainbridge Island.